Générateur d'évaluation des risques
A risk assessment generator produces a structured risk entry — a realistic risk paired with a likelihood, an impact, a calculated rating, and a practical mitigation. Project managers, founders, and operations leads need to build risk registers, but staring at a blank template makes it easy to miss obvious threats or score them inconsistently. This tool surfaces a common business risk, rates it on a likelihood-by-impact scale, and suggests a sensible mitigation, giving you a ready-made register entry to adapt. Click to generate and copy the entry. It is ideal for building a risk register, running a pre-mortem, preparing a board risk review, and teaching risk management. Because each entry includes a clear rating and mitigation, you can prioritise the critical risks first and turn a vague worry into a concrete, owned action.
How to use
- Choose your options above
- Click Generate
- Copy your result
Detailed instructions
- Click Generate to draw a risk entry.
- Read the likelihood, impact, and rating.
- Adapt the mitigation and assign an owner.
- Copy it into your risk register.
Use Cases
- •Building a risk register
- •Running a project pre-mortem
- •Preparing a board risk review
- •Teaching risk management
- •Brainstorming project threats
Tips
- →Prioritise critical risks first.
- →Assign an owner to each risk.
- →Add a review date and revisit often.
- →Generate several to seed a register.
FAQ
how is the rating worked out
Likelihood and impact are each scored Low, Medium, or High, then multiplied on a one-to-three scale. The product, from 1 to 9, sorts risks into Minor, Moderate, and Critical bands so you can prioritise the most serious ones.
are the mitigations realistic
Yes. Each risk comes with a practical, commonly recommended mitigation — like qualifying a second supplier or holding a contingency reserve. Treat it as a starting point and tailor the action and owner to your situation.
how do i build a full register
Generate several entries to seed your register, then add risks specific to your project. Assign each one an owner and a review date, and revisit the register regularly, since likelihood and impact change as work progresses.
How is the risk rating worked out?
Each risk is scored on likelihood and impact, rated Low / Medium / High (1–3 each), and the two are multiplied for a rating out of 9 — higher numbers flag the risks to act on first. So High likelihood × Medium impact gives 6. It is the standard probability-times-impact approach; the generator applies it so each entry comes with a comparable priority score.
How do I turn these into a full risk register?
Generate several entries to cover different categories, then collect them into a table with columns for the risk, likelihood, impact, rating, owner, and mitigation, and review it regularly. Each generated entry is one row's worth of content. Add the risks specific to your project and assign a real owner to each so the register drives action, not just documentation.